In the east part of Milan, the site of the project is located in the middle of a system of parks. The project, takes the form of a monolithic white volume, an abstract architecture that belongs more to the park than to the urban fabric.    The volum

Milan - Library

Milan - Library

 In the east part of Milan, the site of the project is located in the middle of a system of parks. The project, takes the form of a monolithic white volume, an abstract architecture that belongs more to the park than to the urban fabric.    The volum

In the east part of Milan, the site of the project is located in the middle of a system of parks. The project, takes the form of a monolithic white volume, an abstract architecture that belongs more to the park than to the urban fabric.

The volume of the library seats on the linear park and exists strongly in the landscape. The park continues under the building and enters the library through large patios. The building is introverted at the exception of the rooftop, totally public that opens to the view and creates a relationship with the city.

米兰图书馆

项目地为米兰东部,位于公园系统的中央。该项目采用了白色单体的形式,是一个较为抽象的建筑,我们希望其能更多地属于公园系统而非城市结构。

图书馆体块坐落在线性公园上,并强烈地存在于景观中。公园持续延伸至建筑下方,由此通过大型天井进入图书馆。除屋顶外,这座建筑整体为内向型建筑,屋顶区域完全向公众开放,有良好的视野观赏风景,并与城市之间建立了一种联系。

BEIC - 1F Bar.jpg
BEIC - 02 - Front View Cover.jpg
BEIC - 2F Atrium.jpg
BEIC - 03 - North Corner.jpg
BEIC - 05 - Street View.jpg
BEIC - Auditorium.jpg
BEIC - Library 2.jpg
BEIC - Program Diagram.jpg
BEIC - Lobby.jpg
BEIC_Page_04.jpg
BEIC - Open Section.jpg
BEIC_Page_05.jpg
BEIC - 1F Plan Color.jpg
BEIC - Restaurant.jpg
BEIC_Page_09.jpg
BEIC - 2F Plan Color.jpg
BEIC - Section 1.jpg
BEIC - 3F Plan Color.jpg
BEIC - Section 2.jpg
BEIC - 4F Plan Color.jpg
BEIC - 01 - Bird View Day Time.jpg
BEIC - Master Plan.jpg
BEIC - Roof Plan Color.jpg